Nottingham Energy Storage Project
Energy Development Done Right
The Nottingham Energy Storage Project is a 200 MW lithium-ion battery storage system (BESS) strategically located adjacent to existing electrical grid infrastructure in Washington County. The project is projected to be operational in 2028.
Energy development can and should be good for the communities that host it — delivering real benefit to local economies, ecosystems, and quality of life while helping to build a reliable, resilient, affordable energy system that serves the greater good.
The Nottingham Energy Storage Project is a case study what that good development looks like in practice.
-
200 MW / 800 MWh
Expanding access to clean, affordable energy for homes and businesses
-
$85.9M
In taxes, wages, and local spending during construction
-
Community Investment
Direct support for local priorities as part of collaboratively designed community benefit plan
-
Conservation Leadership
Partnering with US Fish & Wildlife Service to preserve habitat and advance conservation goals
-
Energy-Dense Solution
Advanced design on a compact footprint, maximizing output and minimizing land use
-
Climate Goals
Oregon has fallen behind on its goals for a clean, modern grid. This project makes needed progress.
Advancing Conservation Goals
-
Land Donation and Stewardship
BrightNight is donating 11 acres of land to the permanent ownership of the Tualatin River National Wildlife Refuge. The US Fish and Wildlife Service has determined that this donation, along with BrightNight’s commitment to best-in-class land stewardship practices will enhance the Refuge’s conservation goals.
Megan Nagel of the National Wildlife Refuge commented: “This exchange brings a chance to restore wetlands that might not otherwise be available to the refuge. Management goals in the refuge’s long-term management plan include continuing to expand opportunities for conservation by connecting the refuge to more habitat.”
As part of our ongoing land stewardship and maintenance program, we will remove invasive or diseased vegetation to help re-establish a native plant community.
-
Birds and the Nottingham Project
The Nottingham Energy Storage Project has been designed to ensure the long-term preservation of the existing avian flyway that connects the bulk of the Tualatin River National Wildlife Refuge to Onion Flats, a wetlands and important resting area for migratory birds and waterfowl.
In preparation for this project, BrightNight purchased the 32-acre tract of land between Highway 99 and Onion Flats. The majority of this land will be preserved as wetlands and open space, with the low-slung battery storage facility occupying approximately 8 acres. This siting leaves the primary flyway open and unobstructed.
While no lines will cross Refuge land, a short (0.2 mile) generation tie line will follow a private road to connect the project to the Sherwood Substation. BrightNight will design, construct, and operate the Project’s gen-tie transmission line in accordance with the recommendations of the Avian Power Line Interaction Committee (APLIC), the electric utility industry’s recognized authority on avian protection. See FAQs below for more information on APLIC guidelines.
-
Delivering Direct Economic Benefits
The Nottingham Energy Storage Project has the support of local labor unions because of the good jobs to be created during the construction phase, and because of the long-term impact on the region’s ability to attract and retain anchor employers.
Direct economic benefits to the community include:
- 175 to 200 direct and indirect local jobs
- $19.6 million in associated local wages and benefits
Over a 20-year period:
$37.6 million in cumulative local revenue from taxation of the land and taxation of the associated capital investments (in 2026 dollars). Undeveloped, this land would generate approximately $14,000 in tax revenue over the same time period. -
Community Benefit Program
We work closely with project communities to understand local needs and create meaningful community benefit strategy.
We are currently in the process of gathering community input for the Nottingham Energy Storage Project. Potential projects may include:
- Partnerships with area K-12 schools
- Joint-projects with local gardening communities
- Enhancements to regional trails and recreation areas
- Support for local emergency services
-
Supporting Resilient and Affordable Power
In its 2025 Energy Strategy report, the State of Oregon identified utility-scale energy storage projects as a critical missing link in the drive to integrate more renewable energy into the grid while increasing reliability and lowering costs.
The Nottingham Energy Storage Project represents significant progress toward the state’s ambitious energy transition goals. In addition to improving the utility’s ability to integrate least-cost resources, it expands the grid’s capacity to meet growing demand, reducing the likelihood of service disruptions during times of peak energy use.
Want to Learn More?
Download the fact sheet for more information on the Nottingham Energy Storage Project.
Nottingham Project Information Packet
Project FAQs
Talk to the Team
We’re excited to bring the Nottingham Storage Project to Washington County, Oregon and will continue to update this page with the most current information on local meetings and project developments. In the meantime, you can always talk with a member of our Nottingham team. Whether you have a question, concern, or suggestion, we want to hear from you!
-
ContactKathleen CampanellaSenior Director, Development
-
Contact
-
Contact